You are currently viewing How to Check Renovation Permit in Singapore

How to Check Renovation Permit in Singapore




Quick answer: For HDB flats, your HDB-registered renovation contractor applies for the renovation permit on your behalf. You can then check the permit status yourself by logging in to HDB’s e-services (My HDBPage) with Singpass. For condos, renovation approval usually comes from your condo management (MCST), not HDB.

Not sure if your works need a permit? WhatsApp our designers and we’ll check it with you.

Before any hacking, drilling or major works start, it pays to know whether your renovation needs a permit and whether it has been approved. Starting work without one can mean the work is stopped, or that you have to reinstate it at your own cost.

This guide explains who applies for the permit, how to check its status, and what to do if it is delayed or rejected.

 

Renovated HDB living room by 9 Creation

 

Which renovation works need a permit?

For HDB flats, you generally need a permit for works such as:

  • Hacking or removing walls
  • Changing floor finishes in the bathroom or kitchen
  • Building or altering walls, including partitions
  • Works that affect pipes, the household shelter or the building structure

Simple works like painting, installing loose furniture or replacing light fittings usually do not need a permit. Some walls cannot be removed at all, so check our guide to HDB hacking rules before planning a layout change.

 

Who applies for the HDB renovation permit?

For HDB flats, the application is made by an HDB-registered renovation contractor, not by the homeowner. When you engage an interior design firm, it normally handles the permit as part of the job. Ask your designer to confirm this in writing before work starts.

 

How to check your HDB renovation permit status

  1. Get the details from your contractor: ask for the date the permit was submitted and the works it covers.
  2. Log in to HDB’s e-services (My HDBPage) with your Singpass.
  3. Look for the renovation section for your flat and check the permit status and the approved works.
  4. Check that the approved works match your plan. If your designer adds hacking or wall changes later, the permit may need to be updated.

If you cannot find the permit, ask your contractor first. If anything is still unclear, contact HDB directly.

 

HDB flat renovation in progress

 

Common reasons for permit delays

  • Missing or unclear drawings: the plan does not show clearly what is being hacked or built.
  • Works that are not allowed: for example removing a wall that cannot be hacked.
  • Changes after submission: adding new works after the permit was approved.

The simplest way to avoid delays is to confirm the full scope with your designer before the permit is submitted.

Reviews

 

What to do if your permit is rejected

  • Ask your contractor for the reason given by HDB.
  • Adjust the plan, for example keep a wall that cannot be hacked, or change the layout.
  • Resubmit with clearer drawings.

 

Renovation permits for condos

Condo renovations are usually approved by the management corporation (MCST), which has its own rules on working hours, deposits and the type of works allowed. Structural changes may also need a professional engineer and approval from the authorities. See our full guide to condo renovation permits in Singapore.

 

Does a renovation permit cost money?

For HDB flats, the permit is applied for by your contractor and is normally part of the renovation package. Ask your designer whether permit handling is included in your quote, so there are no surprises later.

 

How 9 Creation helps

9 Creation handles the renovation permit as part of our HDB and condo renovation projects, and plans the layout around what is allowed from the start. Visit our Experience Center at 18 Boon Lay Way, Tradehub 21, for a free 3D design drawing, or WhatsApp us your floor plan.

 

Completed home renovation by 9 Creation

 

Frequently asked questions

Do I need to apply for an HDB renovation permit myself?

No. For HDB flats, your HDB-registered renovation contractor applies on your behalf. You can check the status yourself on HDB’s e-services.

Can I start renovation before the permit is approved?

Works that need a permit should only start after approval. Works that do not need a permit, such as painting, can start earlier.

What are the HDB renovation hours?

Renovation and noisy works are only allowed at certain times. See our guides to HDB renovation timing and HDB drilling hours.

Do I need a permit to change windows?

Window replacement must be done by a BCA-approved window contractor. Your designer or window contractor will arrange this.

Wondering how we can bring your dream space to life?

This field is for validation purposes and should be left unchanged.

Accreditation